STOCK EQUIPMENT
View allCement Silos
Batching Plants
Concrete Mixer Trucks
Mini Mix Truck Mixers
Volumetric Concrete Mixers
Concrete Pumps
Rough Terrain Concrete Mixers
Self Loading Truck Mixers
Screed Mortar Products
Concrete Agitators
Reversible Drum Mixers
Pan Mixers
Weigh Hoppers And Bag Breakers
Telehandlers And Forklifts
Generators
Tippers
Miscellaneous
BLOCK MOULDS
View all0
Talk on Whatsapp
| Downloads |
|---|
| TECNO 4-100 Concrete Batching Plant |
| Item | Details |
|---|---|
| Type | Dry |
| Mobility | Mobile |
| Price Range | 0-100k |
| Bins | 4 |
| Output | 51-100 m3 |
2
1
| Downloads |
|---|
| TECNO 4-100 Concrete Batching Plant |
| Item | Details |
|---|---|
| Type | Dry |
| Mobility | Mobile |
| Price Range | 0-100k |
| Bins | 4 |
| Output | 51-100 m3 |
Talk on Whatsapp
| Downloads |
|---|
| TECNO 4-100 Concrete Batching Plant |
| Item | Details |
|---|---|
| Type | Dry |
| Mobility | Mobile |
| Price Range | 0-100k |
| Bins | 4 |
| Output | 51-100 m3 |
With this product you may also need...
HP & Lease Hire Available
Export Shipping Arranged
Hire with option to purchase
Guaranteed Buy Back Scheme
Standard or Extended Warranty
Part Exchange Welcome
Q. WHAT IS THE OUTPUT FOR SAMI DRY BATCHING PLANTS?
SAMI dry batching plants offer an output range of approximately 30 to 60 cubic metres per hour, depending on the specific model, configuration, and site setup.
Q. DO YOU NEED PLANNING PERMISSION FOR A SAMI DRY BATCHING PLANT?
No, planning permission is generally not required for a SAMI dry batching plant because it is fully mobile. The plant is designed to be installed and removed without permanent foundations or fixed groundworks, meaning it is typically classified as temporary, moveable equipment.
Q. WHAT ARE THE GROUND FLOOR REQUIREMENTS FOR A SAMI DRY BATCHING PLANT?
SAMI dry batching plants must be positioned on a suitable concrete slab or hardstanding that can safely support their weight when fully loaded. A ground engineer should carry out a site survey to assess ground conditions and confirm the slab specification, including thickness, load-bearing capacity, and reinforcement.
Q. HOW LONG DOES IT TAKE TO COMMISSION A SAMI DRY BATCHING PLANT?
Commissioning a SAMI dry batching plant typically takes approximately 5–6 hours, depending on site readiness and plant configuration. This process includes setting up the control system, checking mechanical and electrical components, calibrating batching accuracy, and carrying out operational and safety checks.
Q. CAN A SAMI DRY BATCHING PLANT BE OPERATED BY PC?
PC operation is not included as standard on SAMI dry batching plants, which are typically supplied with a dedicated control system designed for straightforward and reliable site operation. However, PC-based operation can be provided on request.
Want to know what your weekly or monthly repayments would be? Use our handy finance calculator to find out!
Calculator
Utranazz in numbers
56
Years in operation
Thank you for your submission!
We'll be in touch shortly.