STOCK EQUIPMENT
View allCement Silos
Batching Plants
Concrete Mixer Trucks
Mini Mix Truck Mixers
Volumetric Concrete Mixers
Concrete Pumps
Rough Terrain Concrete Mixers
Self Loading Truck Mixers
Screed Mortar Products
Concrete Agitators
Reversible Drum Mixers
Pan Mixers
Weigh Hoppers And Bag Breakers
Telehandlers And Forklifts
Generators
Tippers
Miscellaneous
BLOCK MOULDS
View all0
Talk on Whatsapp
| Item | Details |
|---|---|
| Type | Dry |
| Mobility | Mobile |
| Bins | 1, 2, 3, 4 |
| Output | 51-100 m3, 101-150 m3 |
6
| Item | Details |
|---|---|
| Type | Dry |
| Mobility | Mobile |
| Bins | 1, 2, 3, 4 |
| Output | 51-100 m3, 101-150 m3 |
Talk on Whatsapp
| Item | Details |
|---|---|
| Type | Dry |
| Mobility | Mobile |
| Bins | 1, 2, 3, 4 |
| Output | 51-100 m3, 101-150 m3 |
With this product you may also need...
HP & Lease Hire Available
Export Shipping Arranged
Hire with option to purchase
Guaranteed Buy Back Scheme
Standard or Extended Warranty
Part Exchange Welcome
Q. WHAT IS THE LEAD-TIME FOR IMER BATCHING PLANTS?
The typical lead time for IMER batching plants is approximately 8–12 weeks from order confirmation. This timeframe allows for manufacturing, factory testing, and preparation for delivery to site.
Q. IS IT A SKIP OR CONVEYOR SYSTEM?
The system can be supplied as either a skip-fed or conveyor-fed configuration, depending on your site layout, production requirements, and operational preferences.
Q. DOES AN IMER BATCHING PLANT USE A BACK WEIGH SYSTEM?
No, IMER batching plants do not use a back weigh system. Instead, they have a weigh belt system, which continuously measures materials as they are conveyed into the plant.
Q. WHAT IS THE INSTALLATION TIME FOR IMER BATCHING PLANTS?
The typical installation time for IMER batching plants is approximately 2–3 weeks, depending on the plant model, site conditions, and overall project scope. This timeframe includes mechanical assembly, electrical installation, integration of ancillary equipment, and system checks.
Q. IS CRANEAGE REQUIRED FOR IMER BATCHING PLANTS?
Yes, craneage is required for installing IMER batching plants. A suitable crane is needed to safely lift and position major plant components during assembly, including aggregate bins, silos, mixers, and structural parts.
Q. WHAT ARE THE GROUND FLOOR REQUIREMENTS FOR A IMER BATCHING PLANT?
IMER batching plants must be positioned on a suitable concrete slab or hardstanding that can safely support their weight when fully loaded. A ground engineer should carry out a site survey to assess ground conditions and confirm the slab specification, including thickness, load-bearing capacity, and reinforcement.
Q. WHAT IS THE OUTPUT FOR IMER BATCHING PLANTS?
IMER batching plants offer an output range of approximately 35 to 300 cubic metres per hour, depending on the specific model, configuration, and site setup.
Want to know what your weekly or monthly repayments would be? Use our handy finance calculator to find out!
Calculator
Utranazz in numbers
56
Years in operation
Thank you for your submission!